Before materials were unloaded, the floor needed to be leveled. Jeremy and Travis worked the jack and shimmed the beam on all the posts in the "cozy" crawlspace.

Don tied straps to the forks of the sky lift to remove the structural wall panels. The judges gave Don a "10" for perfect form on dismount.


Travis and his fiancee, Dana, joined us for the weekend. Travis will be designing and installing the HVAC for SFH. At this point we're thinking of a high-efficiency, three-ton, two-stage heat pump. The air handler will be hung in the crawl space from joists in the west corner of the home under master bedroom's big, walk-in closet.

Not to be outdone by the big guys, George and Nate initiate construction on Mini Secret Fortress Hideout.