Then, Monday came. A few critical path items jumped the track and will push us back about a week.
- The stainless kitchen cabinets we ordered from Lasertron will be delayed due to an email mixup.
- The heat won't be connected for two weeks, which delays the floor installation.
- We found out cultured marble won't work for the tub or bathroom sinks and devised a Plan B (Neptune Zen Soaker Tub and custom-fabricated under-mount stainless trough sinks).
- And, last, but not least, the company Don scheduled to prime the drywall bumped us a week.
Here are the updated shots from Saturday. As you might expect, we're getting very excited and anxious!
3 comments:
Looks great! I like that you went for a color on the exterior instead of the usual grey.
Hi,
Hopefully, you'll be in by Christmas!
The photos show how open, bright, large, and welcoming the living space, deck, and outside are together. A large contrast from 3635 Holmes craftman style, so it will be a refreshing getaway site.
The siding color looks fine...a rusty red?
Captain Jim
SOOOOOO jealous!!!!! Congrats.
Post a Comment