Interior painting was finished more than a month ago and the bamboo flooring is down.
This week I picked up a stainless kitchen sink with integrated drainboard from Teka. Should look great with the stainless base cabinet and obsidian Paperstone counter.
The Zen tub has finally arrived and the bathrooms are moving forward. The tile is going in and the stainless steel frames for the sinks have been installed. You can see the heat strips for the electric radiant floor system in these shots as well as the Ditra uncoupling membrane. My bare feet can't wait to try out all this great flooring!
Interior painting was finished more than a month ago and the bamboo flooring is down.
This week I picked up a stainless kitchen sink with integrated drainboard from Teka. Should look great with the stainless base cabinet and obsidian Paperstone counter.
The Zen tub has finally arrived and the bathrooms are moving forward. The tile is going in and the stainless steel frames for the sinks have been installed. You can see the heat strips for the electric radiant floor system in these shots as well as the Ditra uncoupling membrane. My bare feet can't wait to try out all this great flooring!
This blog documents the progress of our super-cool, pre-fab home "somewhere" in the wilds of Northwest Arkansas. Rocio Romero designed the home, model LVL, and incorporated our custom modifications. GC Don Lourie is doing the build and architect Brad Satterwhite is providing additional ingenuity.
Friday, February 1, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment